ISO 9001 guide

ISO 9001 Implementation Guide
ISO 9001 GUIDE

Quality Management system software

  Open Mind Worldwide Customers and Partners
 
ISO 9001 Guide
ISO 9001
IMPLEMENTATION
ISO 9000 FAMILY
QUALITY
QUALITY ASSURANCE
QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT
PDCA CYCLE
AUDIT
QUALITY CONTROL
QUALITY CONTROL MANAGEMENT
QUALITY CONTROL TESTING
DOCUMENT MANAGEMENT
ISO 9001 QUALITY MANUAL
ISO SOFTWARE
ISO 9000 FAQ
ISO 9000 GLOSSARY
LINKS

ISO 9001 STORE

 
 

 

 

 
 
 
 
 
 
 
 
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DEMO

  GAP ANALYSIS
  IMPLEMENTATION PROJECT
  GANTT CHART
  DOCUMENTATION
  TRAINING
 
 
   
 
 
 
   
   
     
 

 

7.3.7 Control of Design and development changes

 

7.3.7 Control of Design and development changes

Design and development changes shall be identified and records maintained. The changes shall be reviewed, verified and validated, as appropriate, and approved before implementation. The review of design and development changes shall include evaluation of the effect of the changes on constituent parts and product already delivered.

Records of the results of the review of changes and any necessary actions shall be maintained (see 4.2.4).

(from BS EN ISO 9001:2000)

This clause requires all changes during the development stage to be identified and documented, then approved by someone with the proper authorization. It is also a clause that requires holistic thinking of the entire process (i.e., the importance of the system as a whole and the interdependence of its parts and/or processes).

Maintaining good records regarding this clause is an important part of the process in terms of the product’s development history and future. Using the car as an example again, if you’re designing the alternator and discover during its development that it needs to be interchangeable with an old one, that change should be documented immediately. That way, if you ever need to go back and find out why the design was changed, you have a record that points you in the right direction.

This clause also requires that an organization evaluate the effect of any design change on constituent parts and product already delivered. For example, if you change the size of the alternator and it now bumps against the oil pan and the fan belt, a chain reaction of design problems could occur without considering the design changes and their effects.

It’s important to have control over this process, because you don’t want just anyone changing your design—that can become costly or even a liability. Proper communication of all changes to relevant parties involved in design is strongly encouraged and should be considered necessary preventive action. Having a procedure to manage this action is definitely a good idea.
 

 

 

 

 

 

Home  |  Products  |  Downloads  |  Online Store  |  Support  |  Training  |   PartnerNews |  Licensing  | About Us   |  Contact Us

ISO 9000  |  IMPLEMENTATION  |  ISO 9000 FAMILY  |  QUALITY |  QUALITY ASSURANCE  |  QUALITY MANAGEMENT  TOTAL QUALITY MANAGEMENT | PDCA CYCLE |  AUDIT  | QUALITY CONTROL   |  QUALITY CONTROL MANAGEMENT  |  QUALITY CONTROL TESTING  |   DOCUMENT MANAGEMENT   ISO 9000 QUALITY MANUAL | ISO 9000 SOFTWARE  |   ISO 9000 FAQ   ISO 9000 GLOSSARY LINKS

Legal Terms Privacy PolicyBrand GuideLines  | Common Criteria  

Copyright © 2000 - 2006 Open Mind Solutions  Inc. All Rights Reserved

QUALITY MANAGEMENT SYSTEMS, GENERAL REQUIREMENTS, DOCUMENTATION REQUIREMENTS, GENERAL, QUALITY MANUAL, CONTROL OF DOCUMENTS, CONTROL OF RECORDS, MANAGEMENT RESPONSIBILITY, MANAGEMENT COMMITMENT, CUSTOMER FOCUS, QUALITY POLICY, PLANNING, QUALITY OBJECTIVES, QUALITY MANAGEMENT SYSTEM PLANNING, RESPONSIBILITY, AUTHORITY AND COMMUNICATION, RESPONSIBILITY AND AUTHORITY, MANAGEMENT REPRESENTATIVE, INTERNAL COMMUNICATION, MANAGEMENT REVIEW, GENERAL MANAGEMENT REVIEW, REVIEW INPUT, REVIEW OUTPUT, RESOURCES MANAGEMENT, PROVISION OF RESOURCES, HUMAN RESOURCES, GENERAL, COMPETENCE, AWARENESS AND TRAINING, INFRASTRUCTURE, WORK ENVIRONMENT, PRODUCT REALIZATION, PLANNING OF PRODUCT REALIZATION, CUSTOMER-RELATED PROCESSES, DETERMINATION OF REQUIREMENTS RELATED TO THE PRODUCT, REVIEW OF REQUIREMENTS RELATED TO THE PRODUCT, CUSTOMER COMMUNICATION, DESIGN AND DEVELOPMENT, DESIGN AND DEVELOPMENT PLANNING, DESIGN AND DEVELOPMENT INPUTS, DESIGN AND DEVELOPMENT OUTPUTS, DESIGN AND DEVELOPMENT REVIEW, DESIGN AND DEVELOPMENT VERIFICATION, DESIGN AND DEVELOPMENT VALIDATION, CONTROL OF DESIGN AND DEVELOPMENT CHANGES, PURCHASING, PURCHASING PROCESS, PURCHASING INFORMATION, VERIFICATION OF PURCHASED PRODUCT, PRODUCT AND SERVICE PROVISION, CONTROL OF PRODUCTION AND SERVICE PROVISION, VALIDATION PROCESSES FOR PRODUCTION AND SERVICE PROVISION, IDENTIFICATION AND TRACEABILITY, CUSTOMER PROPERTY, PRESERVATION OF PRODUCT, CONTROL OF MONITORING AND MEASURING DEVICES, MEASUREMENT, ANALYSIS AND IMPROVEMENT, GENERAL MEASUREMENT, ANALYSIS AND IMPROVEMENT, MONITORING AND MEASUREMENT, CUSTOMER SATISFACTION, INTERNAL AUDITS, MONITORING AND MEASUREMENT OF PROCESSES, MONITORING AND MEASUREMENT OF PRODUCT, CONTROL OF NONCONFORMING PRODUCT, ANALYSIS OF DATA, IMPROVEMENT, CONTINUAL IMPROVEMENT, CORRECTIVE ACTION, PREVENTIVE ACTION,

 

ISO 9001 GUIDE